THIS PROJECT WILL DREDGE THE POND, INSTALL WATER QUALITY STRUCTURES UPGRADIENT OF THE POND, DESIGN A BYPASS DRAINAGE SYSTEM WHILE MAINTAINING A BASE FLOW INTO THE POND, INCREASE THE DRAINAGE CAPACITY OF THE DRAINAGE SYSTEM AND STABILIZE AND RESTORE THE DITCH AND STREAM WHICH RECEIVES THE OUTFALL.Certified Firm Utilization: 15.92% ESBE
Date of Closing: May 6, 2010
http://www.state.nj.us/transportation/business/procurement/ProfServ/tp805.shtm